A properly installed solar system goes through two separate approval paths: the local building department and your electric utility.
1. Building permit and inspection
Your city or county building department issues the permit and inspects the installation for code compliance. A system should have a final inspection marked as passed.
How to check: search your address in your local building department's online permit portal, or call them.
2. Utility interconnection and permission to operate
Your electric utility reviews an interconnection application, may install or reprogram your meter, and then issues permission to operate (PTO). Only then should the system be turned on.
How to check: look for a PTO letter or email, ask your utility, and check whether your bill shows energy sent to the grid.
Why it matters
- An unpermitted or uninspected system can cause problems with insurance, warranties and selling your home.
- A system running without PTO may not receive net metering credit.
If something is missing
Contact your installer first. If the installer has closed, a licensed solar contractor can help close out an open permit or complete the utility process.